Removal Of Electrical Box - Daikin FTKE25BVM Service Manual

Super multi nx c-series
Hide thumbs Also See for FTKE25BVM:
Table of Contents

Advertisement

Outdoor Unit (80 / 90 Class)
1.3
Removal of
Procedure
Step
Remove the outer panels
such as top and front
panels.
1
The figure shows the
right side view.
1. Remove the tie wire.
1
Loosen the terminal
board screws, and
remove the wires at A
and B ports.
2
Open the terminal
board cover, and
remove the wires at C
and D ports.
222
Electrical Box
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Procedure
Si12-411A
Points
Match the colors of the tie
wires to A, B, C and D ports
as follows.
(1) - Black
Power
(2) - White
Power
(3) - Red
Transmission
Wires are fixed to the
terminal board with screws.
When reassembling,
reconnect the wires to C and
D ports.
Removal Procedure

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents