Power-On Check on the eAN3810A
This section describes the procedure for performing a power-on check on the eAN3810A.
eAN3810A Power-On Check Procedure
After you unpack a eAN3810A, you must power on it within 24 hours. If you power off the
eAN3810A for maintenance, you must restore power to it within 24 hours.
Figure 1-22
Issue 01 (2017-04-30)
lists the checking items for other cable connections.
Item
The connectors of the other cables must securely connected.
Labels on the cables are legible and bound based on the engineering
requirements. The cables must be bound tightly and neatly. The
sheaths of the cables must not be damaged.
Positions for routing the cables must meet requirements of the
engineering design.
There are no connectors or joints on each PGND cable. None of
PGND cables can be short-circuited or reversely connected. In
addition, these cables are not damaged or broken.
PGND cables are separately bound from other cables.
The protection grounding of the eAN3810A and the surge
protection grounding of the building share one group of ground
conductors.
shows the eAN3810A power-on check procedure.