Section 3 - Installation & Power-Up; Unpacking; Installation; Power-Up - Blonder tongue SDE-4AV-QAM User Manual

Professional mpeg-2 hd/sd encoder
Table of Contents

Advertisement

Section 3 – Installation & Power-up

3.1 Unpacking

You will find the following items in the box:
• Encoder
• Power Cord
• A hardware bag (item 741021300) containing the following:
Seven-foot cross-pinned (cross-over) RJ45 Ethernet cable (QTY=1)

3.2 Installation

The encoder is designed to be installed in a standard 19-inch (483 mm) rack (EIA 310-D, IEC 60297, and DIN 41494 SC48D).
To install the encoder, secure the unit's front panel to the rack by inserting four (4) machine screws, with cup washers,
through the four (4) mounting holes in the front panel.

3.3 Power-up

110/230 VAC Encoders (Stk# 6364/6364 PRO) :
Connect the line cord to a 110/230 VAC, 60/50 Hz outlet. The "POWER" LED on the front-panel will light green.
-48 VDC Encoders (Stk# 6364 48 / 6364 PRO 48) :
Connect the positive and negative leads from the batteries to the rear panel terminal strip.
FOR SAFE AND RELIABLE OPERATION, THE GROUND PIN OF THE POWER CORD PLUG 
MUST BE GROUNDED PROPERLY.
MPEG-2 Encoder
11
Instruction Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hde-hvc-pro63646364 pro

Table of Contents