Heat & Glo TRUE-36S-IFT Installation Manual page 15

Hide thumbs Also See for TRUE-36S-IFT:
Table of Contents

Advertisement

B
C
D
NOTE: 2 X 4 Header positioned vertically. See also Figure 3.7.
Inches
TRUE-36-IFT
Millimeters
Inches
TRUE-42-IFT
Millimeters
Inches
TRUE-50-IFT
Millimeters
* Adjust framing dimensions for interior sheathing (such as sheetrock)
Figure 3.8 Clearances to Combustibles (2 X 4 Construction)
Heat & Glo • TRUE-36-IFT, TRUE-42-IFT, TRUE-50-IFT Installation Manual • 2461-980 Rev. B • 2/17
A
* MINIMUM FRAMING DIMENSIONS USING 2 X 4 CONSTRUCTION
A
B
C
Rough
Rough
Rough
Opening
Opening
Opening
(Vent Pipe)
(Height)
(Depth)
10
56
24
254
1422
610
10
61
24
254
1549
610
10
65
24
254
1651
610
F
G
D
E
F
Rough
Clearance
Combustible
Opening
to Ceiling
Floor
(Width)
59-1/2
52
0
1511
1321
0
65-9/16
52
0
1665
1321
0
73-9/16
52
0
1868
1321
0
E
(FROM APPLIANCE
OPENING TO CEILING)
H
J
I
G
H
Sides of
Combustible
Behind
Appli-
Flooring
Appliance
ance
1
1
25
25
1
1
See Sec-
tion 3.D.
25
25
1
1
25
25
I
J
Front of
Appliance
36
914
36
914
36
914
15

Advertisement

Table of Contents
loading

Table of Contents