Lcd Setting - opti-solar SP6000 Handy Ultra User Manual

Solar hybrid inverter
Table of Contents

Advertisement

LCD Setting

General Setting
After pressing and holding "
button to select setting programs. Press "
Setting Programs:
Program
Description
00
Exit setting mode
Output source priority:
01
To configure load power
source priority
Maximum charging current:
To configure total charging
current for solar and utility
02
chargers.
(Max. charging current =
utility charging current +
solar charging current)
"
button for 3 seconds, the unit will enter the Setup Mode. Press "
" button to confirm you selection or "
Selectable option
Escape
Utility first (default)
Solar first
SBU priority
60A (default)
17
" button to exit.
Utility will provide power to the
loads as first priority.
Solar and battery energy will
provide power to the loads only
when utility power is not available.
Solar energy provides power to the
loads as first priority.
If solar energy is not sufficient to
power all connected loads, Utility
energy will supply power to the
loads at the same time.
Solar energy provides power to the
loads as first priority.
If solar energy is not sufficient to
power all connected loads, battery
energy will supply power to the
loads at the same time.
Utility provides power to the loads
only when battery voltage drops to
either low-level warning voltage or
the setting point in program 12.
Setting range is from 10A to 120A
for SP6000 Handy Ultra/SP8000
Handy Ultra models.