Methods Of Installation; Standard Installation; Compact Installation - Eagle 100 Series Installation & Owner's Manual

Swing gate operators diamond control board or diamond dc control board
Hide thumbs Also See for 100 Series:
Table of Contents

Advertisement

An experienced installer should perform the installation. Improper installation may result in property damage, severe injury or death.
Read the entire manual before proceeding with the installation.
Eagle Access Control Systems, Inc. is not responsible for researching and complying with local building codes. Be sure to check all local
building codes before installation.

Standard Installation

Hinge Center
Eagle-100 - 19.5"
Eagle-200 - 21.75"
B
Concrete Pad
NOTE: If there is limited area for
the arm and this dimension is
less than 35 inches then compact
installation is necessary.
Securing Operator to Pad
Use four 1/2" x 3 1/2"
minimum, up to 1/2" x 6"
sleeve anchors to mount
operator to concrete pad.
1/2
5"
Suggested concrete
depth dimension.
Check local building
24"
codes in your area for
depth of concrete
before installation.
6

METHODS OF INSTALLATION

Closed Gate
A
2"
C
Ground Level
E
D
Eagle-100 or Eagle-200 - Inches
A
B
C
Option 1
12
28
27.5
Option 2
12
30
29.5
Option 3
12
32
25.5
Option 4
12
35
29

Compact Installation

Hinge Center
J
I
Concrete Pad
24"
Recommended Concrete
Pad Dimensions:
Eagle-100 - 20" x 24"
Eagle-200 - 24" x 24"
D
E
34.5
42
36
43
39
44
36
45
F
Closed Gate
G
Be sure that arms
are FULLY extended
and locked when
the gate is in the
closed position.
Compact - Inches
H
F
G
H
Eagle-100
35
22
28
Eagle-200
36
32
25
NOTE: If this dimension is less than
16 inches, secondary entrapment
protection is REQUIRED in this area.
See page 8 for more information.
I
J
11
26
12
27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

200 series200-dc-hd200-dc200200-1hp200-dm

Table of Contents