NOTICE
1-2
1.1 Unpacking the Heating System
When you receive your
heater:
1
Unpack it carefully.
2
Check each component against the provided parts list to
ensure that you have everything and that all parts are
undamaged.
3
If you discover any missing or defective parts, call ITR
immediately.
4
If you are not installing the heater right away, secure all
components so none will be misplaced.
5
Before installing the heater, read the rest of this
Instruction and Operation Manual. It contains
critical information for a proper installation.
It's important to follow the installation procedures in this
manual to ensure maximum performance of the heater and
that you and/or your customers enjoy a warm, comfortable
environment and plenty of hot water when needed.
1.2
Protect Your Warranty
This document reflects approved installation techniques,
methods, and materials, and applies only to ITR equipment.
The heater and supplied components are only guaranteed by
ITR if the entire system has been installed according to the
requirements and recommendations set forth in this manual.
Warranty coverage will not be extended to heaters and
system components (supplied by ITR) used in an improper
installation. Use of any unapproved materials, equipment, or
installation procedures will void the warranty for the entire
heating system. ITR does not accept liability for any damage
or loss of service resulting from unapproved installations
and/or modifications.
Installation Manual for
Section 1, Overview
Hurricane® Zephyr
Hurricane
® Zephyr™ HW Heating System
™
HW
Need help?
Do you have a question about the Hurricane Zephyr HW and is the answer not in the manual?