1-6
·
¼" ID approved fuel supply and return lines
·
#10 sheet metal screws or wood screws for mounting
internal fans.
·
Heater hose – enough to connect the Hurricane Zephyr
to the interior fans. If engine heat is used, heater hose is
required to connect the heater to the engine block (see
Technical Specifications and Standards for details)
·
Clamps
to
secure
connections
·
Overflow bottle (min. 2 quarts) with clear plastic 1/2" ID
hose; tank must be heavy-duty plastic, with a vented, screw-
down cap, and sturdy enough to mount firmly to a vertical
surface
·
DC compatible thermostat(s) depending on the number of
zones for temperature regulation of each zone (up to 4)
· A self-priming pump for filling the system with heat
transfer fluid after installation
· Cabin fans or passive radiators for distributing heat to the
living spaces
refer to Figure 1-3, for a typical series plumbed layout using
the
Hurricane® Zephyr
1.6

Testing and Inspection

After all components have been properly installed according
to
standard
practices,
recommendations of this installation and Operating Manual,
the heating system should be test-operated and inspected
for leaks and proper function.
For your convenience, you can use the pullout Inspection
Check sheet in this manual. The check sheet is divided into
progressive sections, allowing each phase of the inspection
to be carried out systematically, and then signed off by
authorized persons.
Installation Manual for
Section 1, Overview
all
heater
hose
heater.
HW
ABYC
standards
Hurricane
® Zephyr™ HW Heating System
and
fuel
hose
and
the

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Hurricane Zephyr HW and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents