Potable Water Requirements

Plumbing must conform to local codes.
Water temperature: Minimum 3°C (37°F), Maximum
32°C (90°F).
Do not connect the ice machine to a hot water supply.
Be sure all hot water restrictors installed for other
equipment are working. (Check valves on sink faucets,
dishwashers, etc.)
If water pressure exceeds maximum pressure 552 kPa
(80 psig) obtain a water pressure regulator.
A water shut-off valve is required to clean the ice
machine.
A union for both the ice making and condenser water
lines is required.
Water inlet lines require insulation to prevent
condensation.
When local code requires, a back flow preventer must
be installed on the water inlet line.

Drain Connections

Drain lines must have a 2.5 cm per meter of run (1.5
inch drop per 5 feet), and must not create traps.
The floor drain must be large enough to accommodate
drainage from all drains.
Bin drain termination must have an air gap.
Separate insulated bin and water-cooled condenser
drain lines are required.
The bin and ice machine drains must be run separately.