Opening Heat Management Unit (Hmu) On Gas Condensing And Fuel Cell Module; Electrical Connections - Viessmann Vitovalor PT2 Installation And Service Instructions For Contractors

Fuel cell based micro chp unit with integral gas condensing boiler and adjacent cylinder module natural gas version
Table of Contents

Advertisement

Installation sequence

Opening heat management unit (HMU) on gas condensing and fuel cell module

3.
1.
Fig. 34
1. Swivel the casing forwards across the detente
point.
2. Undo the side release clips (red).
3. Swivel the wiring chamber flashing back out of the
casing.

Electrical connections

A
B
40
156
156
Fig. 35
Connections to 230 V~ plugs
Power supply from the power distribution board
External demand/blocking and switched power
lH
outlet
42
2.
2x
M
1~
P1
P2
96
!
Please note
Electronic assemblies can be damaged by elec-
trostatic discharge.
Prior to commencing any work, touch earthed
objects such as heating or water pipes to dis-
charge static loads.
C
74
Switched power outlet
aBH
P1 Power outlet for heating circuit pump for heating
circuit without mixer
P2 No function
D
E
5
1
91
91

Advertisement

Table of Contents
loading

This manual is also suitable for:

F11tF19tF25tF32t

Table of Contents