Viessmann Vitovalor PT2 Installation And Service Instructions For Contractors page 16

Fuel cell based micro chp unit with integral gas condensing boiler and adjacent cylinder module natural gas version
Table of Contents

Advertisement

Preparing for installation
Preparing for installation
Connections on the water side with connection set (standard delivery)
110
62
F
E
D
C
B
A
Fig. 6
A
Heating return R
¾
Cold water R
B
½
DHW circulation R
C
½
DHW R
D
½
Depending on the layout of the modules: Connections
towards the free side on the cylinder module to the
right or left.
Note
All height dimensions have a tolerance of +15 mm on
account of the adjustable feet.
1. Prepare the connections on the heating water side.
Thoroughly flush the heating system.
Note
Fit the on-site expansion vessel (if required) to the
heating return.
16
(cont.)
(accessory)
G
A
B
C
D
E
F
E
Heating flow R
¾
Manometer and drain valve
F
Gas shut-off valve
G
2. Prepare the connections on the DHW side. Install
the safety assembly (accessories or on-site provi-
sion) in the cold water line to DIN 1988 and
EN 806 (see page 40).
Recommendation:
Install the safety valve above the DHW cylinder.
This protects the valve against contamination, scal-
ing and high temperatures.
3. Prepare gas connection to TRGI [or local regula-
tions].

Advertisement

Table of Contents
loading

This manual is also suitable for:

F11tF19tF25tF32t

Table of Contents