Preparing for installation
Siting
(cont.)
Siting option for room heights
A special inspection tee (part no. ZK04464) is required
for this siting option. The cylinder module can only be
installed to the right of the gas condensing and fuel cell
module.
A
125
1205
Fig. 4
Wiring area
A
Preparing for installation
Use a connection set – available as an accessory – to
make the connections on the water side.
Fitting accessories
Before final siting, attach all of the accessories that are
to be mounted from the back of the boiler (e.g. connec-
tion set).
!
Please note
Avoid damaging the appliance.
Connect all pipework free of load and torque
stress.
14
2000 mm
2030 mm
≥
≤
Preparing connections on site:
Connection set installation instructions