Configuring Switches In A Stack; High-Speed Stacking Cable Connections - Enterasys SecureStack C2 C2G170-24 Hardware Installation Manual

Enterasys securestack c2 c2g170-24: install guide
Hide thumbs Also See for SecureStack C2 C2G170-24:
Table of Contents

Advertisement

Configuring Switches in a Stack

Figure 3-8
À
À
À
1 High-speed stacking cable
2 STACK DOWN connector
3 STACK UP connector
After connecting the cables to the stacking ports, proceed to "Configuring Switches in a 
Stack" on page 3‐12 for instructions.

Configuring Switches in a Stack

The information in the following sections is important to understand SecureStack switch 
operation in a stack installation.
3-12 Hardware Installation

High-Speed Stacking Cable Connections

Ã
Â
Â
Á
Â
Á
Ä
Á
À
4 STACK DOWN connector at top of stack
5 STACK UP connector at bottom of stack

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Securestack c2g170-24

Table of Contents