12. Install Arm Restraints & Lifting Arms
A. Locate the arms, arm pivot pins, and hardware. Place the arm clevis end into the clevis on the
carriage. Place thrust washer on bottom side of carriage clevis.
B. Install the swing arms to the carriages using the pins. Secure pin to carriage with clip at bottom of
pin.
C. Check the operation of the arm restraints. Make sure they engage and disengage properly
DON'T FORCE THE GEARS, IT MAY BE NECESSARY TO PULL UP ON THE RESTRAINT ACTUATOR PIN
IN ORDER TO INSTALL THE SWING ARM PIN.
D. Ensure arm restraint gear bolts are tightened to 30 – 34 ft. lbs.
E. Place lifting pads in end of swing arms.
13. Filling Reservoir Tank
A. Remove the fill level screw of the power unit tank. Fill it with
Hydraulic Oil - SAE-10, AW 32 or equivalent
Replace the fill screw.
14. Lubricate the four inside corners of both columns with heavy duty bearing grease.
15. Electrical Connection to Power Unit & Overhead Limit Switch
A. Have a certified electrician make the electrical connection from power supply to the power unit. Use
separate circuit for each power unit, as shown below in (Fig. 14).
B. Have a certified electrician make the electrical connection for the overhead limit switch to power unit's
switch box, as shown in (Fig. 14).
Electrical Wiring must comply with local code. Protect each circuit with time delay fuse or
circuit breaker. For 208V-230V single phase, use 20 amp fuse.
Never operate the motor in line voltage less than 208VAC as motor damage may occur.
, until fluid reaches the bottom of the screw hole.
208 - 230VAC, 1PH, 60Hz
Fig. 14
21
TP12KSC-DX
July 2018-A