4.0 BOILER ASSEMBLY

The installation of the boiler shall be in accordance with the authorities having jurisdiction and must comply with
Standard CSA B139 (Canada) or NFPA 31 (USA).
Fiberglass Materials - Before installing the insulated jacket, read "Handling Instructions"
in Section 9.0 and the protective measures recommended when handling fiberglass.
Jacket Installation
1. Do not fully tighten screws until jacket assembly is complete.
2. Level the boiler before commencing jacket installation.
3. Remove all protective plastic film on the jacket parts before installing.
4. Position the left and right panels alongside the boiler (Figure 4-1).
5. Attach front and back panels, positioning them over the side panels (Figure 4-2).
6. Mount top panels (front and rear) over water pipes and smoke hood (Figure 4-3).
7. Fully tighten all jacket screws to secure panels in place.
8. Mount Tridicator and Well on the boiler as shown (Figure 4-4).
9. Position the HydroStat 3250 over well and secure in place from underneath.
10. Insert sensor fully into the well or boiler overheating may occur. See instructions included with HydroStat.
Figure 4-1 Side Panels
Left Panel
Right Panel
Figure 4-3 Top Panels
Top Rear
Boiler Assembly - Installation & Operation Instructions
Back Panel
Figure 4-4 Tridicator, Well & HydroStat 3250
Top Front
Figure 4-2 Front & Back Panels
Failure to install the sensor fully into
the well may cause boiler overheating
resulting in fire, damage, or death.
Tridicator
Triton
Upper Front
Lower Front
Standard Well
HydroStat
3250
7