Download Print this page

Floor Section - OLT FJ Bevel Assembly Manual

Hide thumbs Also See for FJ Bevel:

Advertisement

A. Floor Section
Plywood Floor
Large (2)
Short Floor
Runners (5)
Long Floor
Runners (5)
1.
Lay out Large Floor Joist Frame and 2 Floor Joists. Position Joists equally in Floor Joist Frame.
Use Small Floor Joist Frame as a template to determine joist position. Position Joist flush with
framing. When correctly positioned, attach each Joist with 4 - 2 1/2" screws.
2.
Lay out Floor Joist Frames as illustrated
above. There are 2 larger and 2 smaller Frame
Sections. The Footprint for the floor when
attached together will be 96" wide x 91" deep.
Toll Free 1-888-658-1658
You can find the
Square Drive Bit
for the screws in
with the Hardware
Kit Bag.
If reversing roof and walls,
also reverse Floor Frames.
www.outdoorlivingtoday.com
Page 4
Exploded view of all parts necessary to
complete Floor Section. Identify all parts
prior to starting. Note: Floor Footprint is
96" wide x 91" deep.
Plywood Floor
Small (2)
Concrete Pad
(optional foundation method)
Flush
with
framing
3.
Attach each large and small floor joist
frames together with 6 - 2 1/2" screws per
section.
sales@outdoorlivingtoday.com
Floor Joist
Frames
Small (2)
Floor Joist
Frames
Large (2)

Advertisement

loading

This manual is also suitable for:

Ssgs88-fj-metalSunshedSsgs88-metal