Download Print this page

Miscellaneous Section - OLT FJ Bevel Assembly Manual

Hide thumbs Also See for FJ Bevel:

Advertisement

E. Miscellaneous Section
68.
Attach Bottom Skirting (8 @ 1/2" x 4 1/2" x 45 1/4") around the base of the shed. Skirting will
hide floor framing. Gaps in corners will be covered by Wide Trim pieces later. Start with side pieces
first and attach with 4 - 1 1/2" finishing nails per piece.
Optional:
Caulking seams will help prevent moisture from entering your shed. Caulking is
included to complete Polygal Windows only. Additional Caulking may be required.
69.
Position 2 Door Trims (2 - 1/2" x 2 1/2" x 87") on each side of door opening. Right side will sit
flush with Door Jamb. Left side will sit flush on edge of Narrow wall. Do a dry run with the Horizontal
Gable Trim (Step 89) to determine vertical height of Trims. Attach with 8 - 1 1/2" finishing nails each.
Position Triangular Gable Trim over exposed cavity of Gable Wall on Long Roof Side. Use
2 finishing nails to secure into rafter. Complete for both front and rear.
Toll Free 1-888-658-1658
68b.
To trim out side walls, locate Top Wall Trims
(1/2" x 1 1/2" x 45 1/4"). Position at top of side wall tight
against roof soffit. Attach with 4 - 1 1/2" finishing nails per
piece.
Note: Triangular Gable
Trim is located inside
gable corner behind scrap
piece marked with "X"
Determine vertical location of
trim by using horizontal Gable
Trim as a guide. See Step 82.
www.outdoorlivingtoday.com
Page 28
Triangular
Gable Trim
sales@outdoorlivingtoday.com

Advertisement

loading

This manual is also suitable for:

Ssgs88-fj-metalSunshedSsgs88-metal