Brief Instruction; Unpacking; Model Confirmation; Appearance Inspection - Saluki S1131 User Manual

Signal generator
Table of Contents

Advertisement

3 Brief Instruction

3.1 Unpacking

3.1.1

Model Confirmation

After opening the packing box, you will see the following items:
S1131 Signal Generator x 1
Three-wire Power Cord x 1
CD x 1
Please check the above items against the Purchase Contract and the Packing List. If any problem, please contact Saluki and
we will deal with the problem as soon as possible.
3.1.2

Appearance Inspection

Inspect carefully whether the instrument has any damage during transportation. If the instrument has obvious damage, it is
strictly forbidden to be powered on. Please contact Saluki and we will repair or exchange it be as soon as possible.
3.1.3

Operating Environment

Refer to the part of environment adaptability in the technical specifications of appendix 1. In addition, pay special attention to
the following requirements:
Power supply:
110 – 220V ±15%,50Hz – 60Hz ±5%,20W
Power socket: a three-wire supply socket that must be grounded reliably.
Instrument power cord: packed three-wire power cord
Before connecting the Signal Generator with the power supply, please carefully verify if the
power supply voltage. Otherwise, it is much possible to damage the instrument or even
cause personal injuries with wrong power supply.
To prevent or reduce the possible damage to the internal hardware of the signal generator
due to the mutual interference caused by multi equipment through the power supply,
especially the peak pulse interference caused by high-power equipment, it is best to use a
220V/110V AC stabilized-voltage power supply to supply power for the signal generator.
Tel: 886.2.2175 2930 Email: sales@salukitec.com
10
www.salukitec.com

Advertisement

Table of Contents
loading

Table of Contents