MAGUIRE WEIGH SCALE BLENDER Installation Operation & Maintenance page 18

Hide thumbs Also See for WEIGH SCALE BLENDER:
Table of Contents

Advertisement

B L E N D E R 
W E I G H
S C A L E
1B.
Stand Mounted:
If you are mounting the blender on a
stand, your unit will bolt directly to the
stand.
An air operated FLOW CONTROL
ASSEMBLY (FCA) is provided for
dispensing into a container.
The purpose of the FCA is to allow
time for mixing to occur after each
dispense. This flow valve keeps the
mix chamber full to just below the
sensor.
The FCA assembly bolts directly to
the bottom of the Weigh Scale
Blender frame.
2.
Slide the WEIGH BIN into position. It rests behind the clear-hinged access window.
On models 100, 200, and 400 install weigh bin with the air cylinder to the left. On
models 900, 1800, 2400 and 3000 install weigh bin with the air cylinder towards you.
On Micro Blenders, install the weigh bin with the load cell hanger to the left. If bin is
already in place, remove any shipping materials, packing tape or string.
3.
Hang the Color and Additive Feeders: (Optional)
a. Lift side latches and fully extend slide assembly. Remove the hopper. Leave slide
extended.
b. Tilting the entire slide assembly, motor end up, insert one corner of hanger cross bar
behind frame corner post.
c. Rotate assembly into place so both ends of cross bar are behind corner posts.
d. Lower into place, bottom edge resting on frame and cross bar properly positioned
behind corner posts.
e. Re-install hopper. Slide motor forward until latches engage.
4.
Place the controller on the support tray and plug in all cords:
a. Air solenoid 17 pin plug into the matching receptacle.
b. Auger feeder drive motors into duplex receptacle.
c. Mixer motor into right side of controller.
d. Sensor cord plug into front side of controller.
e. Load Cell plug into port on left side of controller.
M A G U I R E
P R O D U C T S ,
I N C .
18

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents