STEP 3: Align the hole on the bottom of log #3 with the log
#3 placement tab and the rest log #3 on log #2 as shown.
STEP 5: Fill in the rest of the burner pan and ember plates
with lava rock and vermiculite. Do not place lava rock or
vermiculite on any of the burner ports.
MQLOGC22 for MQZDV3318 / 3622 / ZCV3622
STEP 4: Place Log #4 into place as shown. Do Not place
directly over top of the multiple porting area on the left side.
Finished log setup
Finished log set is displayed with optional VLBIT6
28