3.
Fill hole with concrete. Tamp down concrete to release air pockets and build drainage hill.
4.
Insert rebar (10) through holes in ground tube assembly (2) as shown.
10
10
1" (2.54 cm)
HR83005.EPS
211560
2
10
8
DRAINAGE HILL
PLAYING SURFACE
SIDE VIEW
Need help?
Do you have a question about the In-Ground Basketball System and is the answer not in the manual?