1.
Ensure ground is level with playing surface, then dig pole hole.
WARNING!
CONTACT UTILITIES
BEFORE DIGGING.
NOTE:
Check building codes for your location to
determine apropriate hole depth for cement.
2.
Install mounting bolts (19) and nuts (25) to ground tube (2) as shown.
GROUND SURFACE
XG02.EPS
25
2
19
24" (61 cm)
48" (121.9 cm)
Nuts on the top of the plate are used for leveling
the pole after system is fully assembled.
7
24" (61 cm)
48" (121.9 cm)
2 6" (15,2 cm)
24" (61 cm)
PLAYING SURFACE
NOTE:
Need help?
Do you have a question about the In-Ground Basketball System and is the answer not in the manual?