Download Print this page

Veris Industries E30E Series Installation Manual page 9

Solid-core panelboard monitoring system
Hide thumbs Also See for E30E Series:

Advertisement

Installation Guide
Power Monitoring
E30E Series
Installation (cont.)
Wiring
Z206792-0B
Page 9 of 24
Alta Labs, Enercept, Enspector, Hawkeye, Trustat, Aerospond, Veris, and the Veris 'V' logo are trademarks or registered trademarks of Veris Industries, L.L.C. in the USA and/or other countries.
Shop for Power Metering products online at:
6. Connect 0.333 VAC current transformers (CTs) to the conductors to be monitored by snapping the CTs around the lines,
observing local codes regarding bending radius.
Panel 2
Panel 1
Note: The E30E measures and reports the phase angle of each voltage input and each CT (when there is active current
through the primary of that CT). Use the E3x Configuration Tool to view the phase angles of active circuits to help verify
that those circuits are connected to and mapped to the proper voltage phases. See the E3x Commissioning Guide (www.
veris.com) for instructions on how to download and operate the tool from a PC.
For all steps in this section, when tightening terminals, apply the correct torque.
Aux Inputs: 3.5 to 4.4 in-lb (0.4 to 0.5 N-m); all other terminals: 4.4 to 5.3 in-lb (0.5 to 0.6 N-m).
1. Wire the Aux input CTs to the E30E. Note: For Veris CTs, X1 is the white lead, X2 is the black lead.
2. Connect 2-wire 100-277 VAC power to the control power terminals. Observe polarity. Connect voltage lines to the voltage taps.
Equip voltage lines with fuses and disconnects as required.
Voltage Inputs
90-300V 50/60Hz
VN
V3
V2
V1
L-L
L-N
Voltage taps are shared by both panels.
©2014 Veris Industries USA 800.354.8556 or +1.503.598.4564 / support@veris.com
PowerMeterStore
Other companies' trademarks are hereby acknowledged to belong to their respective owners.
www.
Control Power
100-277V 50/60Hz 15VA
V
V2/N
V1
V2/N
04142
1.877.766.5412
.ca
TM

Advertisement

loading