Download Print this page

Veris Industries E30E Series Installation Manual page 4

Solid-core panelboard monitoring system
Hide thumbs Also See for E30E Series:

Advertisement

Installation Guide
Power Monitoring
E30E Series
Product Diagram
Z206792-0B
Page 4 of 24
Alta Labs, Enercept, Enspector, Hawkeye, Trustat, Aerospond, Veris, and the Veris 'V' logo are trademarks or registered trademarks of Veris Industries, L.L.C. in the USA and/or other countries.
Shop for Power Metering products online at:
1
4
7
1. Ethernet port: provides ethernet connection for the gateway component
2. Power LED: indicates power is applied to the meter.
3. 2x3 RS-485 Serial Connection
4. Grounding post
5. Voltage Taps: 1, 2, or 3 phase plus neutral connections. For voltage sensing and power calculations
6. Control (Mains) Power Connection: Easy 2-wire 100-277 VAC, 50/60 Hz connection.
7. Auxiliary Inputs: These 0.333 VAC inputs are used for monitoring the main breaker or other high amperage source. Inputs on
the left are for panelboard 2; inputs on the right are for panelboard 1.
8. 50-Pin Ribbon Cable Connectors: 48-inch (1220 mm) ribbon cables are provided for easy connection of the current sensor strips
to this point of the data acquisition board. Other ribbon cable lengths are available (sold separately) The two connectors on the
left are for panelboard 2; the two on the right are for panelboard 1.
Connect current sensor strips to the correct ribbon cable connectors for each panel. The top connectors are for the strip labeled
Panel B, and the bottom conectors are for the strip labeled Panel A.
©2014 Veris Industries USA 800.354.8556 or +1.503.598.4564 / support@veris.com
PowerMeterStore
Other companies' trademarks are hereby acknowledged to belong to their respective owners.
www.
2
3
5
6
7
8
04142
1.877.766.5412
.ca
TM

Advertisement

loading