Seal The Gateway; Figure 14: Cellular Gateway Battery Switch; Figure 15: Local Gateway Battery Switch; Figure 16: Battery Switch Location Detail - Geokon GeoNet 8900 Series Instruction Manual

Wireless data hosting system
Hide thumbs Also See for GeoNet 8900 Series:
Table of Contents

Advertisement

Power Source
Mains or solar with external battery
Solar without external battery

TABLE 5: Cellular Gateway Battery Switch Options

FIGURE 14: Cellular Gateway Battery Switch

Local Gateway 890X-XX-SUP-232, 890X-XX-SUP-USB
Move the battery select switch to either the
depending on the type of battery being used.
Align the positive (+) side of the batteries with the + indicator in the battery
holder. Push the batteries straight down into the holder.

FIGURE 15: Local Gateway Battery Switch

FIGURE 16: Battery Switch Location Detail

3.2.3 SEAL THE GATEWAY

1.
Place the supplied desiccant packs inside the enclosure.
2.
Ensure the cover gasket and the mating ridge on the enclosure are clean,
and that the gasket is properly seated inside the groove on the cover. Place
the cover on the unit.
MODEL 8900 SERIES GEONET WIRELESS DATA HOSTING SYSTEM | NETWORK INSTALLATION | 13
Geographic Zone
Sub Polar
Temperate
EXT BATTERY
INT BATTERY
N/A
or
ALKALINE
LITHIUM
5:
14:
position
15:
16:

Advertisement

Table of Contents
loading

Table of Contents