Technimount System BRACKET PRO 25 Series User Manual page 21

Table of Contents

Advertisement

INSTALLATION OF THE BRACKET ONTO THE ZOLL X SERIES MONITOR/
DEFIBRILLATOR (CONTINUED)
17. Install the two (2) Stainless Steel Socket Head
Screws into the bracket from under the disc.
18. Tighten both screws.
19. Install the two (2) Flat Head Philips
Screws M4 x 0.7 x 25 mm.
20. Tighten both screws.
21. The ZOLL X Series Monitor/Defibrillator is ready
for EMS transport.
www.technimount.com
Installation Guide
BP25 and 25-HD UG 202111-01
Return To Table of Contents
Return To Table of Contents
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bracket pro 25-hd series

Table of Contents