TA Instruments TGA5500 Getting Started Manual page 50

Table of Contents

Advertisement

10 Fully tighten the thumbscrew once proper alignment is achieved.
11 Re-install the furnace exhaust tube.
12 Turn off the instrument. Insert the lower furnace assembly cable connector into the connector shown
below. Tighten the knurled nut.
Figure 39 Lower furnace accessory cable installed.
13 Connect the 1/8-inch Teflon TFE tubing from the base of the instrument to the LFA air cool inlet, as
shown in the figure below. Note that the figure below also displays the sample purge line, which was
installed in
"Connecting Lines to the Gas Delivery Module" on page
Figure 40 Lower furnace assembly fully installed.
14 Proceed to the next section to complete installation of the Discovery TGA.
Discovery TGA™ Getting Started Guide
Lower furnace assembly cable
33.
Sample purge line
Air cool line
Page 50

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tga550Tga55

Table of Contents