Test Operation Control - Rheem RHMV2421MNACJA Service Manual

Duct type
Hide thumbs Also See for RHMV2421MNACJA:
Table of Contents

Advertisement

9. TEST OPERATION CONTROL

With Wired Remote Control
Touch the [Test run] in the "Maintenance" screen.
The "Test Run" screen is displayed.
Touch [OK] to return to the Maintenance screen, and start the test run.
The test run will automatically end is approximately 60 min.
If you wish to cancel the test run before it is complete, return to the "Monitor Mode screen", and touch
the On/Off button.
*Installer password is required.
If the password has been charged from the default setting "0000",
contact to the installer.
04-23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents