Install A Hot-Swap Power Supply - Lenovo ThinkAgile HX1321 Series User Manual

Node
Table of Contents

Advertisement

Figure 24. Hot-swap power supply removal
After removing the power supply:
1. Install a new power supply or install the power-supply filler to cover the power supply bay. See "Install a
hot-swap power supply" on page 55.
Important: To ensure proper cooling during normal server operation, both of the power supply bays
must be occupied. This means that each bay must have a power supply installed; or one has a power
supply installed and the other has a power supply filler installed.
2. If you are instructed to return the old hot-swap power supply, follow all packaging instructions and use
any packaging materials that are provided.

Install a hot-swap power supply

Use this information to install a hot-swap power supply.
"Read the
installation
Guidelines" on
page 43
The following tips describe the type of power supply that the server supports and other information that you
must consider when you install a power supply:
• The standard shipping has only one power supply installed in the server. For redundancy and hot-swap
support, you must install an additional hot-swap power supply. Certain customized models might be
shipped with two power supplies installed.
• Ensure that the devices that you are installing are supported. For a list of supported optional devices for
the server, see
http://www.lenovo.com/us/en/serverproven/
Notes:
• Ensure that the two power supplies installed on the server have the same wattage.
"ATTENTION:
Static Sensitive Device
Ground package before opening"
on page 45
Chapter 8
.
Hardware replacement procedures
55

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Thinkagile hx seriesThinkagile hx3321 seriesThinkagile hx1321Thinkagile hx3321

Table of Contents