Endress+Hauser Proline 200 FOUNDATION Fieldbus Brief Operating Instructions
Endress+Hauser Proline 200 FOUNDATION Fieldbus Brief Operating Instructions

Endress+Hauser Proline 200 FOUNDATION Fieldbus Brief Operating Instructions

Transmitter with coriolis sensor

Advertisement

Quick Links

KA01267D/06/EN/02.18
71409635
2018-08-01
Products
Brief Operating Instructions
Proline 200
FOUNDATION Fieldbus
Transmitter with Coriolis sensor
These instructions are Brief Operating Instructions; they are
not a substitute for the Operating Instructions pertaining to
the device.
Transmitter Brief Operating Instructions
Contain information about the transmitter.
Sensor Brief Operating Instructions →  3
Solutions
Services

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Proline 200 FOUNDATION Fieldbus and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Endress+Hauser Proline 200 FOUNDATION Fieldbus

  • Page 1 Products Solutions Services KA01267D/06/EN/02.18 71409635 2018-08-01 Brief Operating Instructions Proline 200 FOUNDATION Fieldbus Transmitter with Coriolis sensor These instructions are Brief Operating Instructions; they are not a substitute for the Operating Instructions pertaining to the device. Transmitter Brief Operating Instructions Contain information about the transmitter.
  • Page 2 Proline 200 FOUNDATION Fieldbus Order code: XXXXX-XXXXXX Ser. no.: XXXXXXXXXXXX Ext. ord. cd.: XXX.XXXX.XX Serial number www.endress.com/deviceviewer Endress+Hauser Operations App A0023555 Endress+Hauser...
  • Page 3 These Brief Operating Instructions are the Transmitter Brief Operating Instructions. The "Sensor Brief Operating Instructions" are available via: • Internet: www.endress.com/deviceviewer • Smart phone/tablet: Endress+Hauser Operations App Detailed information about the device can be found in the Operating Instructions and the other documentation: • Internet: www.endress.com/deviceviewer...
  • Page 4: Table Of Contents

    Table of contents Proline 200 FOUNDATION Fieldbus Table of contents Document information ............5 Symbols used .
  • Page 5: Document Information

    Proline 200 FOUNDATION Fieldbus Document information Document information Symbols used 1.1.1 Safety symbols Symbol Meaning DANGER! DANGER This symbol alerts you to a dangerous situation. Failure to avoid this situation will result in serious or fatal injury. WARNING! This symbol alerts you to a dangerous situation. Failure to avoid this situation can result in WARNING serious or fatal injury.
  • Page 6 Document information Proline 200 FOUNDATION Fieldbus Symbol Meaning Protective Earth (PE) A terminal which must be connected to ground prior to establishing any other connections. The ground terminals are situated inside and outside the device: • Inner ground terminal: Connects the protectiv earth to the mains supply.
  • Page 7: Basic Safety Instructions

    Proline 200 FOUNDATION Fieldbus Basic safety instructions Basic safety instructions Requirements for the personnel The personnel must fulfill the following requirements for its tasks: ‣ Trained, qualified specialists must have a relevant qualification for this specific function and task. ‣...
  • Page 8: Workplace Safety

    Verification for borderline cases: ‣ For special fluids and fluids for cleaning, Endress+Hauser is glad to provide assistance in verifying the corrosion resistance of fluid-wetted materials, but does not accept any warranty or liability as minute changes in the temperature, concentration or level of contamination in the process can alter the corrosion resistance properties.
  • Page 9: Product Safety

    It meets general safety standards and legal requirements. It also complies with the EU directives listed in the device-specific EU Declaration of Conformity. Endress+Hauser confirms this by affixing the CE mark to the device. IT security Our warranty is valid only if the device is installed and used as described in the Operating Instructions.
  • Page 10: Turning The Display Module

    Installation Proline 200 FOUNDATION Fieldbus max. 350° 8 mm 8 mm A0032242 Release the fixing screw. Turn the housing to the desired position. Firmly tighten the securing screw. Turning the display module The display module can be turned to optimize display readability and operability.
  • Page 11: Transmitter Post-Installation Check

    Proline 200 FOUNDATION Fieldbus Installation Transmitter post-installation check The post-installation check must always be performed after the following tasks: • Turning the transmitter housing • Turning the display module Is the device undamaged (visual inspection)?  Are the securing screw and securing clamp tightened securely? ...
  • Page 12: Electrical Connection

    Electrical connection Proline 200 FOUNDATION Fieldbus Electrical connection Connection conditions 5.1.1 Required tools • For cable entries: Use corresponding tools • For securing clamp: Allen key 3 mm • Wire stripper • When using stranded cables: Crimper for wire end ferrule •...
  • Page 13 Proline 200 FOUNDATION Fieldbus Electrical connection 5.1.3 Terminal assignment Transmitter Connection version for FOUNDATION Fieldbus, pulse/frequency/switch output A0013570 A0018161 Maximum number of terminals Maximum number of terminals for order code for "Accessory mounted", option NA "Overvoltage protection" Output 1: FOUNDATION Fieldbus...
  • Page 14 Electrical connection Proline 200 FOUNDATION Fieldbus For reasons concerning explosion protection, it is recommended that grounding be dispensed with. To comply with both requirements, there are basically three different types of shielding in the fieldbus system: • Shielding at both ends •...
  • Page 15 Proline 200 FOUNDATION Fieldbus Electrical connection A0028768  1 Connection example for FOUNDATION Fieldbus Control system (e.g. PLC) Power conditioner (FOUNDATION Fieldbus) Cable shield: the cable shield must be grounded at both ends to comply with EMC requirements; observe cable specifications...
  • Page 16: Connecting The Measuring Device

    Electrical connection Proline 200 FOUNDATION Fieldbus 5.1.7 Preparing the measuring device NOTICE Insufficient sealing of the housing! Operational reliability of the measuring device could be compromised. ‣ Use suitable cable glands corresponding to the degree of protection. Remove dummy plug if present.
  • Page 17 Proline 200 FOUNDATION Fieldbus Electrical connection Connection via terminals 3 mm 20 mm 10 (0.4) mm (in) A0032239 Loosen the securing clamp of the connection compartment cover. Unscrew the connection compartment cover. Push the cable through the cable entry . To ensure tight sealing, do not remove the sealing ring from the cable entry.
  • Page 18: Ensuring The Degree Of Protection

    Electrical connection Proline 200 FOUNDATION Fieldbus Removing a cable 3 (0.12) A0032240 ‣ To remove a cable from the terminal, use a flat-blade screwdriver to push the slot between the two terminal holes while simultaneously pulling the cable end out of the terminal.
  • Page 19: Post-Connection Check

    Proline 200 FOUNDATION Fieldbus Electrical connection To ensure that moisture does not enter the cable entry: Route the cable so that it loops down before the cable entry ("water trap").  A0029278 Insert dummy plugs into unused cable entries. Post-connection check Are cables or the device undamaged (visual inspection)? ...
  • Page 20: Operation Options

    Operation options Proline 200 FOUNDATION Fieldbus Operation options Overview of operation options A0032226 Local operation via display module Computer with operating tool (e.g. FieldCare, DeviceCare, AMS Device Manager, SIMATIC PDM) Field Xpert SFX350 or SFX370 Field Communicator 475 Control system (e.g. PLC)
  • Page 21: Structure And Function Of The Operating Menu

    Proline 200 FOUNDATION Fieldbus Operation options Structure and function of the operating menu 6.2.1 Structure of the operating menu Operating menu for operators and maintenances Language Operation task-oriented Setup Diagnostics Operating menu for experts Expert function-oriented A0014058-EN  2 Schematic structure of the operating menu 6.2.2...
  • Page 22: Access To The Operating Menu Via The Local Display

    Operation options Proline 200 FOUNDATION Fieldbus Access to the operating menu via the local display X X X X X X 19.184 mA 12.5 X X X X X X Language 20.50 Ã English Deutsch Español Français Xxxxxxx A B C D E F G H I J K M N O P Q R S T U V W +0.000 Xx...
  • Page 23 Proline 200 FOUNDATION Fieldbus Operation options 6.3.1 Operational display Explanatory symbols for the measured value Status area • Depends on the device version, e.g.: The following symbols appear in the status area of the – : Volume flow operational display at the top right: –...
  • Page 24 Operation options Proline 200 FOUNDATION Fieldbus Numeric editor Confirms selection. Moves the input position one position to the left. Exits the input without applying the changes. Inserts decimal separator at the input position. Inserts minus sign at the input position.
  • Page 25: Access To The Operating Menu Via The Operating Tool

    Proline 200 FOUNDATION Fieldbus System integration Keys and meaning Reduces the contrast (brighter setting). Plus/Enter key combination (press and hold down the keys simultaneously) Increases the contrast (darker setting). Minus/Plus/Enter key combination (press the keys simultaneously) For operational display:Enables or disables the keypad lock.
  • Page 26: Switching On The Measuring Device

    Commissioning Proline 200 FOUNDATION Fieldbus • "Post-installation check" checklist→  11 • "Post-connection check" checklist →  19 Switching on the measuring device ‣ After a successful function check, switch on the measuring device.  After a successful startup, the local display switches automatically from the startup display to the operational display.
  • Page 27: Configuring The Measuring Device

    Proline 200 FOUNDATION Fieldbus Commissioning Configuring the measuring device The Setup menu with its System units submenu and various guided wizards enable fast commissioning of the measuring device. The desired units can be selected in the System units submenu. The wizards systematically guide the user through all the parameters required for configuration, such as parameters for measurement or outputs.
  • Page 28: Protecting Settings From Unauthorized Access

    Diagnostic information Proline 200 FOUNDATION Fieldbus Parameter overview with brief description Parameter Description User entry Factory setting Device tag Enter the name for the Max. 32 characters such as Promass 200 measuring point. letters, numbers or special characters (e. g. @, %, /)
  • Page 29 Proline 200 FOUNDATION Fieldbus Diagnostic information X X X X X X X X X X X X X X 20.50 S801 Supply voltage Menu Diagnostic list Diagnostics 1 S801 Supply voltage Diagnostics 2 Diagnostics 3 Supply voltage (ID:203) S801 0d00h02m25s...
  • Page 32 www.addresses.endress.com...

Table of Contents