7. Verify DC Extension Cable Connector Operation
Turn pump on and start an infusion. Plug DC extension cable to charger and
pump. Verify that battery charge icon on charger is lit. Verify that the
battery icon on the pump turns off.
8. Volume Delivery (page 22)
a. Perform Volume Delivery Calibration procedure to obtain assessment.
b. Volume delivery test passes if volume delivered is setting +/- 5%.
9. Occlusion Pressure (page 26)
a. Perform Occlusion Pressure Calibration procedure to obtain assessment.
b. Occlusion pressure test passes if pressure limit +/- 2 psi is achieved.
10. Ground Strap Test
a. Test continuity between center charger connector pin and door hook. If
no continuity, ship to CME America for installation.
11. QC and Calibration Labels
a. Upon completion of the Service and the Operational Checklist and
Performance Acceptance Test, place a QC label on the pump
indicating "QC Approved" as a tamper proof indicator and place a
calibration label on the pump indicating the "date of calibration" and
"initials of the technician" performing the calibration.
21
of 50