Download Print this page

Solid State Logic Network I/O SB 8.8 Installation Notes page 10

Advertisement

5.
You can then launch the program. The photo below shows a screen capture of the program
when first opened.
Installation Problem solving
If there are points after or during the installation where network connectivity problems are
observed, a full power cycle of the unit typically reestablishes full connectivity.
If the instructions to power cycle have not been followed and the unit has been soft rebooted from
Dante controller after the updates performed, it has been seen that the device cannot be seen in
Dante controller or the front panel "RUN" Led shows red, indicating a network fault.
The device will still show a ​ g reen​ connected light on its rear ​ n etwork interface​ , but will not be
visible in​ Dante Controller​ and will not appear in the ​ S SL Network I/O Updater software​ .
To resolve this connection issue ​ r emove both power cables​ from the back of the device ensuring
the device has completely powered down, then replug the power cables and allow the device to
come back online. The device should now be seen in both ​ D ante Controller​ and ​ S SL Network I/O
Updater​ .
Network I/O SB V2.1 Installation Notes 
 
Page 9 

Advertisement

loading
Need help?

Need help?

Do you have a question about the Network I/O SB 8.8 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Network i/o sb i16