Download Print this page

STA-RITE DB10018T Owner's Manual page 9

Battery backup systems

Advertisement

Installation
Model Number DB20018T:
1. Connect charger as shown in Table III and in Figure 11.
PUMP/POMPE/BOMBA (+)
FLOAT/FLOTTEUR/FLOTADOR (+)
PUMP/POMPE/BOMBA (–)
BATTERY/BATTERIE/BATERÍA (–)
FLOAT/FLOTTEUR/FLOTADOR (–)
BATTERY/BATTERIE/BATERÍA (+)
PUMP/POMPE/BOMBA (+)
FLOAT/FLOTTEUR/FLOTADOR (+)
PUMP/POMPE/BOMBA (–)
BATTERY/BATTERIE/BATERÍA (–)
FLOAT/FLOTTEUR/FLOTADOR (–)
BATTERY/BATTERIE/BATERÍA (+)
Figure 11 – Wiring Connections DB20018T
TABLE III - DB20018T Wiring Connections
Connect the
Positive (+) lead from the battery
Negative (–) lead from the battery
Positive (+) "Backup sump Pump"
lead (BROWN wire)
Negative (–) "Backup sump Pump"
lead (BLACK wire)
Positive (+) Float switch Lead
(WHITE wire)
Negative (–) Float Switch Lead
(BLACK wire)
2. Plug the charger into a 115 Volt AC outlet delivering
at least 15 amps. Do not use a switch controlled
outlet. Mark the circuit in the main power panel
"Backup sump pump power supply; do not turn off".
3. With the charger properly connected and plugged in,
the panel on the front of the charger will show one of
the following conditions (See Figure 12).
To the position indicated
below, on the charger
Positive battery terminal
(leads are provided)
Negative battery terminal
(leads are provided)
Positive pump lead terminal
Negative pump lead terminal
Positive float switch terminal
Negative float switch terminal
A.C.POWER
STATUS
PUMP RUN
STATUS
ALARM SILENCE
BATTERY STATUS
CHARGER MODE
SILENCE
ARRÉT/SILENCIO
Figure 12 – DB20018T LED Panel
Red "AC Power On" LED - AC power is present
Yellow (bicolor) LED on continuously - Prequalification test is
complete and charging is in process.
Yellow "Charging" LED flashing on and off quickly. -
Equalization charge stage.
Green (bicolor) LED is on - Battery is being maintained at full
charge.
Bicolor LED flashing yellow/green alternatively - See Error
Charge Table (Table IV).
TABLE IV - Charge Error Table for DB20018T
Bicolor LED flashing
Yellow/Green alternatively
Red "Pump Run"
LED flashing
Red "Power" LED flashing
Bicolor LED and the Red
"Power" LED flashing
Red "Power" and "Pump"
LED's flashing
Test the Assembly:
1. Plug the primary pump into a properly grounded
3-prong outlet.
2. Fill the sump with water to start the primary pump.
Check for leaks.
3. Unplug the primary pump and fill the sump with
water to start the backup system pump. Check for
leaks.
4. Plug the primary pump back into a properly grounded
3-prong outlet. The system is now ready for operation.
ÉTAT DU COURANT ALTERNATIF.
ESTADO DE LA CORRIENTE ALTERNA.
ÉTAT DE FONCTIONNEMENT DE
LA POMPE.
ESTADO DE FUNCIONAMIENTO DE
LA BOMBA.
ARRÉT D'ALARME.
SILENCIO DE ALARMA.
ÉTAT DE LA BATTERIE.
ESTADO DE LA BATERÍA.
MODE DU CHARGEUR.
MODO DE CARGADO.
ALARM
RESET/RÉARMEMENT
ALARME/ALARMA
REPOSICIÓN
3464 0799
Failed pre-qualification test.
New battery may be needed
Battery voltage is greater than
expected
Current is greater than expected
One cell within the battery is
overheating
Battery pack has taken too long to
charge
9

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Db20018t