Operating Controls - Bunn ICB-TWIN Installation And Operating Manual

Infusion series with smart funnel
Hide thumbs Also See for ICB-TWIN:
Table of Contents

Advertisement

G
E
A. ON/OFF SWITCH
Pressing the "ON/OFF" pad will alternately turn the selected brewing side on and off. Pressing this pad during
the brew cycle will interrupt the brew cycle, stopping the flow of water. Pressing this pad during programming
of the brewer will exit the setup and return to the main screen.
B. PROGRAMMING (left)
This hidden pad can be used to scroll backwards through the function list while in programming mode.
C. BREW (A,B,C)
When the ON/OFF switch is ON and the main screen is visible, momentarily pressing and releasing this pad
will begin a brew cycle on the selected side.
D. PROGRAMMING (right)
Pressing and holding this pad allows entry into the programming menus. Pressing and releasing the pad
steps through each function screen while in the programming mode.
E. BATCH SELECTOR PADS
Pressing the pad corresponding to the Half or Full batch selects the amount of product to be brewed on the
selected side. Pressing a different pad after a brew cycle has been initiated does not change the brew batch in
progress. Light indicates the selected batch to brew. Also used in programming to adjust settings on both batch
sizes.
F. FUNCTION SCREEN
This is the display which shows the various functions of the brewer and allows the programming to be ac-
complished.
G. FUNNEL SENSING COIL
These are used to "receive" information from the Smart Funnel handle, recipe cards, and ad cards.
H. FUNCTION SCREEN PADS
These are hidden pads which are used to program the brewer when in the programming mode.

OPERATING CONTROLS

A
B
READY TO BREW
ENABLE
ON / OFF
WATER TEMP: 200°
BREW
C
F
D
G
H
Page 7
A
ENABLE
ON / OFF
BREW
C
38112.1 042105
E

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents