Bunn ICBA Installation & Operating Instructions Manual

Bunn ICBA Installation & Operating Instructions Manual

Infusion series with smart funnel

Advertisement

ICBA, ICBB,ICBC,
ICB-DV, ICB Twin
Infusion Series
®
with Smart Funnel
®
Supercedes Operating Manuals:
37077.0000; 38112.0001
INSTALLATION & OPERATING GUIDE
BUNN-O-MATIC CORPORATION
POST OFFICE BOX 3227
SPRINGFIELD, ILLINOIS 62708-3227
PHONE: (217) 529-6601
FAX: (217) 529-6644
To ensure you have the latest revision of the Operating Manual, or to view the Illustrated Parts
Catalog, Programming Manual, or Service Manual, please visit the Bunn-O-Matic website, at
www.bunn.com. This is absolutely FREE, and the quickest way to obtain the latest catalog and
manual updates. For Technical Service, contact Bunn-O-Matic Corporation at 1-800-286-6070.
41581.0000D
12/12 ©2008 Bunn-O-Matic Corporation

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ICBA and is the answer not in the manual?

Questions and answers

Summary of Contents for Bunn ICBA

  • Page 1 To ensure you have the latest revision of the Operating Manual, or to view the Illustrated Parts Catalog, Programming Manual, or Service Manual, please visit the Bunn-O-Matic website, at www.bunn.com. This is absolutely FREE, and the quickest way to obtain the latest catalog and manual updates. For Technical Service, contact Bunn-O-Matic Corporation at 1-800-286-6070.
  • Page 2: Warranty

    AS SPECIFIED HEREIN, TO REPAIR, REPLACEMENT OR REFUND. In no event shall BUNN be liable for any other damage or loss, including, but not limited to, lost profits, lost sales, loss of use of equipment, claims of Buyer’s customers, cost of capital, cost of down time, cost of substitute equipment, facilities or services, or any other special, incidental or consequential damages.
  • Page 3: Table Of Contents

    Viewing Assigned Recipes, Asset, & Serial Number ...........8 Coffee Brewing ....................9 Cleaning ......................10 Glossary ......................10 Programming ....................12 ICB-DV ........................Dual Voltage Machine ICBA ..........................230 Volt Machine ICBB ..........................200 Volt Machine ICB Twin ......................120/208-240V or 2330V Page 3 41581 120408...
  • Page 4: User Notices

    DAMAGE, FIRE OR SHOCK HAZARD. READ THE ENTIRE FOR USE ONLY ON AN OPERATING MANUAL BEFORE INDIVIDUAL BRANCH USING THIS PRODUCT PN: 00658.0000G 02/08 © 1985 BUNN-O-MATIC CORPORATION CIRCUIT RATED 20 AMPS 00986.0000F 10/07 ©1994 Bunn-O-Matic Corporation #00985.0000 #00658.0000 #00986.0000...
  • Page 5: Electrical Requirements

    ELECTRICAL REQUIREMENTS Refer to Data Plate on the Brewer, and local/national electrical codes to determine circuit requirements. WARNING - The brewer must be disconnected from the power source until specified. WARNING - The power cord must be UL Listed, Flexible Cord Type SO, SJO, SJTO, HSJO or SJOW, Rated 90° C, and the attachment plug cap must be UL Listed, in order to avoid a hazard.
  • Page 6: Plumbing Requirements

    NOTE - Bunn-O-Matic recommends 3⁄8" copper tubing for all installations from the 1⁄2" water supply line. A tight coil of tubing in the water line will facilitate moving the brewer to clean the countertop. Bunn-O-Matic does not recommend the use of a saddle valve to install the brewer. The size and shape of the hole made in the supply line by this type of device may restrict water flow.
  • Page 7: Operating Controls

    OPERATING CONTROLS ® READY TO BREW ENABLE ENABLE ON / OFF ON / OFF WATER TEMP: 200° BREW BREW NOTE – For Singles, refer to left side of Twins A. ENABLE BREW ON/OFF SWITCH Pressing the "ENABLE BREW ON/OFF" switch (indicator on) enables the brew circuit (on that side of Twins), and energizes the tank refill circuit.
  • Page 8: Initial Set-Up

    INITIAL SET-UP Insert an empty funnel into the funnel rails of the brew station(s). Place an empty server(s) under the funnel(s). Connect the brewer to the power source. Make sure the corresponding "ENABLE BREW ON/OFF" switch is ON (LED will be lit). Water will flow into the tank and stop when the tank is filled to its capacity.
  • Page 9: Coffee Brewing

    WITHOUT A SMART FUNNEL AND MHG or DBC GRINDER: 1. Begin each brew cycle with a clean empty brew funnel. 2. Insert a BUNN filter into the funnel. 3. Pour the fresh coffee into the filter and level the bed of grounds by gently shaking.
  • Page 10: Cleaning

    1. The use of a damp cloth rinsed in any mild, nonabrasive, liquid detergent is recommended for cleaning all surfaces on Bunn-O-Matic equipment. Do NOT clean this equipment with a water jet device. 2. Check and clean each sprayhead. The sprayhead holes must always remain open.
  • Page 11 With the switch in the P3048 "ON" position, the programming menus can still be accessed to view the current settings. However, no changes will be saved. For more advanced PROGRAMMING information, refer to programming manual 41581.0001 at www.bunn.com Page 11 41581 120408...
  • Page 12: Programming

    R SPRY OZ/M: XX.X L BYPS OZ/M: XX.X DONE DONE DONE DONE CALIBRATE FLOW? BREW COUNTERS? ENTER ASSET # ENTER SERVICE # For more advanced PROGRAMMING SERVICE TOOLS FACTORY DEFAULTS information, refer to programming manual 41581.0001 at www.bunn.com Page 12 41581 120408...

This manual is also suitable for:

IcbcIcbbIcb-dvIcb twin

Table of Contents