Installation; Mounting Components Inside The La-Rak; Moving And Transporting The La-Rak; Amp Cooling - L-Acoustics LA-RAK User Manual

Hide thumbs Also See for LA-RAK:
Table of Contents

Advertisement

LA-RAK
TOURING RACK
user manual
VERSION 2.0

6 INSTALLATION

6.1

Mounting components inside the LA-RAK

The 9U inner frame (see Figure 4) is for mounting components to both front and rear faces:
The LA-PANEL, the LA-PANEL AES3 and optional switches mount to the front face using four screws and
four washers each.
The LA-POWER mounts to the rear face using four screws and four washers.
Each LA8 mounts to both front and rear faces using eight screws and eight washers.
During transport or while on tour it is essential that the LA8 controllers are rear supported in addition to
the front panel mounting. Use the rear rack support brackets provided with each LA8 or the LA-RAK
optional spacers (see references in section [7.4]).
CAUTION
6.2

Moving and transporting the LA-RAK

The removable dolly board (see Figure 10) is for moving and transporting a vertical array of two LA-RAK. It secures
to the bottom LA-RAK using two coupling bars (see [6.4]).
For moving or transporting purposes, a maximum of two LA-RAK can be set onto one dolly board.
WARNING
6.3

Amp cooling

Each LA8 amplified controller uses a forced air cooling system to maintain a low and even operating temperature. All
fan cooled L-ACOUSTICS
®
Before operation, ensure that the front filter system of each LA8 is clean and dust free (see the LA8 User
Manual [3.4]).
While operating keep the LEXAN
CAUTION
front and rear air vents.
LARAK_UM_EN_2.0
amplified controllers have front to rear airflow.
®
front and rear doors retracted (see below) and do not block the LA8
w w w . l - a c o u s t i c s . c o m
16

Advertisement

Table of Contents
loading

Table of Contents