Installation Guide
Rails Box
Chassis
8 Drive boxes
4.2 Ultrastar Data102 Unpacking Procedure
Step 1 : Make sure that all of the necessary equipment is available, including any equipment necessary to
support the enclosure during installation. To verify the list of necessary equipment, see:
Box Contents (page
Step 2 : Cut the straps that secure the packaging to the pallet with a box cutter.
Step 3 : Remove the top cap and the outer sleeve and discard them both.
Container
32).
4.2 Ultrastar Data102 Unpacking Procedure
Contents
◦ 30 M5 x 12, T15 Torx screws
◦ 2 M5 x 12 Philips Panhead screws (for
cover retention)
◦ 16 Custom Round Washers
◦ 6 Custom Low-Profile M4 Screws
(packaged with the rail kit)
• Cables
◦ 2 C13 to C14 Power Cables (3m)
◦ 2 MiniSAS HD cables (3m)
2 Rack Rails w/ 1 Inner Rail per Rack Rail
Chassis w/ all internal components pre-installed
except drives.
7 with 14 drives per container, 1 with 4 drives. 102
Drive assemblies total
4. Packaging
Table 14:
33