Boiler Fixing - Riello RDB 3.2 BT 58/70 Installation, Use And Maintenance Instructions

Kerosene burner, one stage operation
Table of Contents

Advertisement

5.6

Boiler fixing

Prepare a suitable lifting system.
Installation
1
E9187
Fig. 6
5
1
2
13
GB
D5012
 Put on the flange 1)(Fig. 6) the screw and two nuts.
 Widen, if necessary, the insulating gasket holes (5), (see
Fig. 7).
 Fix the flange 1)(Fig. 8) to the boiler door 4) using screws 2)
and (if necessary) the nuts 3) interposing the insulating gas-
ket 5).
The seal between burner and boiler must be
airtight.
WARNING
4
2
Fig. 7
3
E9188
Fig. 8
20158125

Advertisement

Table of Contents
loading

This manual is also suitable for:

20157841

Table of Contents