Electrical Wiring; Control Box - Riello RDB 3.2 BT 58/70 Installation, Use And Maintenance Instructions

Kerosene burner, one stage operation
Table of Contents

Advertisement

7.2

Electrical wiring

~ 50Hz - 230V
PE
L
N
Main switch
T6A
Safety
thermostat
Limit
thermostat
6 pin plug
6 pole socket
Burner-earth
 Do not swap neutral and phase over, follow
the diagram shown carefully and carry out a
good earth connection.
WARNING
 The electrical wiring carried out by the
installer must be in compliance with the rules
in force in the country.
 The section of the conductors must be at
least 1mm
local standards and legislation).
TESTING:
Check the shut-down of the burner by opening the thermostats
and the lock-out by darkening the flame sensor.
Electrical system
Remote lock-out signal
(230V - 0.5A max.)
Ignition
electrodes

CONTROL BOX

Flame sensor
Oil valve
Motor
Blue
White
Black
D4238
Capacitor
2
. (Unless requested otherwise by
7.2.1
Control box
This operation must be performed with the burner
turned off and mains power disconnected.
DANGER
To remove the control box (Fig. 16) from the burner follow of the
instruction:
 Loosen the screw 1), open the protection 2) and remove all
components.
 Remove the coil 3).
 Loosen the two screws 4).
 Move a little the control box and remove the high voltage
leads.
4
3
4
Fig. 15
19
GB
2
1
E9153
Fig. 16
20158125

Advertisement

Table of Contents
loading

This manual is also suitable for:

20157841

Table of Contents