Combustion Head Setting; Normal Operation Burner Start-Up Cycle - Riello RDB 3.2 BT 58/70 Installation, Use And Maintenance Instructions

Kerosene burner, one stage operation
Table of Contents

Advertisement

8.8

Combustion head setting

To adjust the combustion head, proceed as follows:
 loosen the two screws in the ring slots.
 Turn the blast tube to regulate it, until the end of the slotted
ring centres up with the notch shown in the Tab. H on
page 20.
Turn in a clockwise direction:
in order to increase the volume of air entering the combus-
tion chamber and thus diminishing its pressure.
There is a reduction of CO2 and the adhesion of the flame to
the air diffuser disc improves.
(Setting advisable for ignitions at low temperatures).
Turn in an anticlockwise direction:
in order to reduce the volume of air entering the combustion
chamber and thus increasing its pressure.
The CO2 improves and the adhesion of the flame to the dif-
fuser tends to reduce.
(This setting is not advisable for ignitions at low tempera-
tures).
 Tighten the two screws.
8.9

Normal operation burner start-up cycle

Normal
Thermostat
Motor
Ignition transformer
Valve
Flame
Lock-out lamp
Lock out is indicated by a lamp on the control box (5, Fig. 1 on
page 9).
20158125
Start-up, calibration and operation of the burner
~ 12s
D4268
Lock-out due to failure to light
~ 12s
22
GB
Slotted ring
Screw
0
Shutter
Screw
Blast tube
~ 5s
Fig. 20
D5229
Fig. 21

Advertisement

Table of Contents
loading

This manual is also suitable for:

20157841

Table of Contents