Verifying the Installation

1. Check that there is no foreign matter at the top and bottom of the cabinet, copper bars, and the
rear of modules.
Switches
2. After routing cables and verifying cable
connections, seal the gap between cables
and the cabinet using flake sealing putty.
(Remove the paper protective film from the
sealing putty and use the aluminum foil film
together with the sealing putty.)
Paper
protective film
Sealing putty must be used as a whole and the
gap can be sealed only from the top.
Battery input wiring copper bars
Output wiring copper bars
Bypass input wiring copper bars
3. After verifying the installation, reinstall all the
covers.
4. Do not remove the dustproof cover before
power-on to prevent dust from entering the
UPS.
Sealing putty