Huawei UPS5000-A-400K-FTS Quick Manual page 4

Hide thumbs Also See for UPS5000-A-400K-FTS:
Table of Contents

Advertisement

3.2
Installing Cables
Scenario 1: Routing Cables from the Top
2. Remove the top cover from the cabinet
1. Open the front door of the bypass cabinet,
based on cable routes and dimensions.
and remove power distribution covers
4. Connect the ground cable to the UPS.
3. Remove the copper bar between the mains
and bypass inputs. (Skip this step if there is
only one mains input)
4

Advertisement

Table of Contents
loading

Table of Contents