Transporting And Lifting; Installation - Baileigh Industrial MSS-14F Operator's Manual

Metal forming shrinker stretcher
Table of Contents

Advertisement

TRANSPORTING AND LIFTING

NOTICE: Lifting and carrying operations should be carried out by skilled workers, such as a
truck operator, crane operator, etc. If a crane is used to lift the machine, attach the lifting
chain carefully, making sure the machine is well balanced.
Follow these guidelines when lifting with truck or trolley:
• The lift truck must be able to lift at least 1.5 – 2 times
the machines gross weight.
• Make sure the machine is balanced. While
transporting, avoid rough or jerky motion, and maintain
a safe clearance zone around the transport area.
• Use a fork lift with sufficient lifting capacity and forks
that are long enough to reach the complete width of
the machine.
• Remove the securing bolts that attach the machine to
the pallet.
• Approaching the machine from the side, lift the machine on the frame taking care that there
are no cables or pipes in the area of the forks.
• Move the machine to the required position and lower gently to the floor.
• Level the machine so that all the supporting feet are taking the weight of the machine and no
rocking is taking place.

INSTALLATION

IMPORTANT:
Consider the following when looking for a suitable location to place the machine:
• Overall weight of the machine.
• Weight of material being processed.
• Sizes of material to be processed through the machine.
• Space needed for auxiliary stands, work tables, or other machinery.
• Clearance from walls and other obstacles.
• Maintain an adequate working area around the machine for safety.
• Have the work area well illuminated with proper lighting.
• Keep the floor free of oil and make sure it is not slippery.
10
10

Advertisement

Table of Contents
loading

Table of Contents