The Typhoon is designed for a water supply line of 1" pipe. Plumb from pool return line with a 1"
1.
PVC pipe "stubbed up" at the deck positioned at the base of the ladder. Refer to
FIGURE A on page 5.
2.
FIGURE A is for reference only. Assembled slide should be placed in its correct location and the
3.
"stub up" location marked and installed before mounting the slide to the deck. "Stub up" should be
dark grey PVC to match the plumbing assembly of the slide. Note: "Stub up" should extend
above the deck 18" (457 mm) in height. It can be cut to proper length further in the
installation process.
If a garden hose is to be used, a garden
4.
hose adapter fitting is included with the
slide. Assemble the pieces as shown in
FIGURE L and attach to the end of the PVC
plumbing assembly at the base of the
ladder.
Proceed to the following section for ON-DECK
5.
MOUNTING. After the slide has been mounted to the
deck, attach the "stub up" as necessary to the plumbing
assembly installed in the ladder.
The Typhoon can handle up to 20 gallons per minute
6.
(75 L/min). Water flow is to be regulated using the ball
valve near the base of the ladder