Table Of Contents; About The Documentation; About This Document - Daikin Altherma EABH16DA6V Installation Manual

Low temperature split
Hide thumbs Also See for Altherma EABH16DA6V:
Table of Contents

Advertisement

Table of contents

1.1
About this document..................................................................
2.1
Indoor unit .................................................................................
2.1.1
3.1
Preparing the installation site ....................................................
3.1.1
3.2
Preparing water piping ..............................................................
3.2.1
3.2.2
Third-party tank requirements.....................................
3.3
Preparing electrical wiring .........................................................
3.3.1
internal actuators ........................................................
4.1
Opening the units ......................................................................
4.1.1
To open the indoor unit ...............................................
4.2
Mounting the indoor unit............................................................
4.2.1
To install the indoor unit..............................................
4.2.2
4.3
Connecting the water piping......................................................
4.3.1
To connect the water piping........................................
4.3.2
To fill the water circuit .................................................
4.3.3
4.3.4
To fill the domestic hot water tank ..............................
4.3.5
To insulate the water piping ........................................
4.4
Connecting the electrical wiring.................................................
4.4.1
About electrical compliance ........................................
4.4.2
4.4.3
To connect the main power supply .............................
4.4.4
4.4.5
To connect the shut-off valve...................................... 11
4.4.6
To connect the electrical meters ................................. 11
4.4.7
4.4.8
To connect the alarm output ....................................... 12
4.4.9
output .......................................................................... 12
4.4.10
4.4.11
4.4.12
contact) ....................................................................... 12
4.5
Finishing the indoor unit installation .......................................... 13
4.5.1
To close the indoor unit............................................... 13
5.1
Overview: Configuration ............................................................ 13
5.1.1
To access the most used commands ......................... 13
5.2
Configuration wizard.................................................................. 14
5.2.1
Configuration wizard: Language ................................. 14
5.2.2
Configuration wizard: Time and date .......................... 14
5.2.3
Configuration wizard: System ..................................... 14
5.2.4
Configuration wizard: Backup heater .......................... 15
5.2.5
Configuration wizard: Main zone................................. 16
5.2.6
Configuration wizard: Additional zone......................... 16
5.2.7
5.2.8
Configuration wizard: Tank ......................................... 17
5.3
Settings menu ........................................................................... 18
5.3.1
Main zone ................................................................... 18
5.3.2
Additional zone ........................................................... 18
5.3.3
Information .................................................................. 18
5.4
Menu structure: Overview installer settings............................... 19
6.1
Checklist before commissioning................................................ 20
EABH/X16DA+9W
Daikin Altherma - Low temperature split
4P556066-1 - 2018.10
6.2
Checklist during commissioning ................................................. 20
6.2.1
To check the minimum flow rate .................................. 20
6.2.2
To perform an air purge ............................................... 20
6.2.3
To perform an operation test run ................................. 21
6.2.4
To perform an actuator test run ................................... 21
3
6.2.5
3
4
4
4
8.1
Piping diagram: Indoor unit ........................................................ 22
8.2
Wiring diagram: Indoor unit ........................................................ 23
4
4
4
1

About the documentation

4
4
5
1.1

About this document

5
Target audience
5
Authorised installers
5
Documentation set
5
5
This document is part of a documentation set. The complete set
consists of:
6
6
▪ General safety precautions:
7
▪ Safety instructions that you must read before installing
7
7
▪ Format: Paper (in the box of the indoor unit)
8
▪ Indoor unit installation manual:
8
▪ Installation instructions
9
9
▪ Format: Paper (in the box of the indoor unit)
9
▪ Outdoor unit installation manual:
9
▪ Installation instructions
9
9
▪ Format: Paper (in the box of the outdoor unit)
▪ Installer reference guide:
▪ Preparation of the installation, good practices, reference data,...
▪ Format: Digital files on
and-manuals/product-information/
▪ Addendum book for optional equipment:
▪ Additional info about how to install optional equipment
▪ Format: Paper (in the box of the indoor unit) + Digital files on
http://www.daikineurope.com/support-and-manuals/product-
information/
Latest revisions of the supplied documentation may be available on
the regional Daikin website or via your dealer.
13
The original documentation is written in English. All other languages
are translations.
Technical engineering data
▪ A subset of the latest technical data is available on the regional
Daikin website (publicly accessible).
▪ The full set of latest technical data is available on the Daikin
extranet (authentication required).
20
Table of contents
http://www.daikineurope.com/support-
Installation manual
21
22
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents