The following information is provided to assist building contractors, shop fitters and site operators to plan and
prepare the site and intended location for the installation of a Sanremo espresso machine.
It is important that all services are in place prior to machine installation and should be within
1 metre
of intended
machine position. Our technicians are only authorised to connect to properly terminated services. Insurance
limitations preclude us from carrying out any work to a site's water, waste or electricity supplies.

Advertisement

loading

Summary of Contents for Sanremo Verona TCS 4

  • Page 1 The following information is provided to assist building contractors, shop fitters and site operators to plan and prepare the site and intended location for the installation of a Sanremo espresso machine. It is important that all services are in place prior to machine installation and should be within...
  • Page 2 The installation should then be completed within 1½ hours of our engineers gaining unrestricted access to the site. Site Name Address Site Contact: Telephone I confirm that the site will be prepared as per the Sanremo pre installation guidelines prior to (date) …../…../…… Signed………………………………….. on behalf of……………………………………………….date……………………………………………….