The following information is provided to assist building contractors, shop fitters and site operators to plan and prepare the site and intended location for the installation of a Sanremo espresso machine. It is important that all services are in place prior to machine installation and should be within...
Page 2
The installation should then be completed within 1½ hours of our engineers gaining unrestricted access to the site. Site Name Address Site Contact: Telephone I confirm that the site will be prepared as per the Sanremo pre installation guidelines prior to (date) …../…../…… Signed………………………………….. on behalf of……………………………………………….date……………………………………………….