Installation Instructions - Impecca IWA06-KR15 User Manual

Electronic window air conditioner with remote
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS

Use caution when unpacking and installing. Sharp edges can cause injury.
Appearance of unit in these diagrams is for illustrative purposes only and may not precisely
reflect your unit's design.
STEP 1: INSTALLING THE UPPER RAIL (IF NOT ALREADY ATTACHED)
1. Your upper rail may have come with the upper rail seal already affixed to the bottom
of the rail. If it is packaged separately, peel the backing off and affix it to the bottom
of the rail ensuring that the holes in the seal match up with the screw holes in the
rail. (Fig. A)
2. Use the 4 screws (included) to attach the upper rail to the pre-drilled holes on the
top of the cabinet as shown in Figure B. Ensure that the higher part of the rail is
facing the front of the air conditioning unit.
(Fig. B)
Upper Rail
Fig. A
Note: Be sure to use all four screws when attaching
the top rail.
STEP 2: MOUNTING THE FLEXIBLE FILLER PANELS
1. Note the "Left" and "Right" markings on the panels.
2. Extend the flexible part of the filler panel past the filler panel's frame
3. Slide the T-section into the side guide rails on the left and right of the unit.
4. Gently insert the upper and lower ends of the panel frame into the upper and lower
rail channels on the air conditioning unit.
T-section
Upper Rail seal
1
–14–
Fig.B
2
Upper Rail
Lower Rail

Advertisement

Table of Contents
loading

Table of Contents