Installing Terminations with Built-In Frames
11
11
1.
Frame the termination opening to 11" x 11".
2.
Fasten the termination to the studs using a minimum of 4
screws.
Installing Terminations with MSR Frames
f i r e - p a r t s . c o m
12
12
1. Frame the termination opening to 12" x 12".
2. Fasten the termination to the studs using a minimum of 4
screws.
Installing Terminations with MOSR Frames
MOSR
MTO-3
1.
Frame the termination opening to 12" x 12".
2.
Fasten the MOSR frame to the interior side of the studs using
a minimum of 4 screws.
3.
Insert the termination into the MOSR frame as shown here,
and attach by screwing through the four pilot holes in the
termination.
Part No. XG0106B
Installation
Installing Heat Guards over Terminations
MTO-3F
1.
2.
MSR
MTO-3
12 12
12
MD34-DV-2 Homefire
Ensure that the two long mounting brackets are facing the
bottom of the termination. (See inset). This will provide more
heat protection at the top of the termination, where tempera-
tures are highest.
Attach to the faceplate of the termination using four sheet metal
screws.
MTKOG
Page 5