Commissioning Check List
The following information will be required to validate your 5yr parts warranty
Check and record
Leak (tightness) test pressure
Strength (pressure) test pressure
Evacuation level
Low pressure (gauge)
Suction line temperature
Evaporator superheat
Evaporator air ON / OFF
High pressure (gauge)
Liquid line temperature
Condenser sub cooling
Condenser air ON / OFF
Compressor current
Head pressure control set
Refrigerant type
Charged weight
Additional POE oil added
Pipe run length
Suction pipe size
Liquid / Expansion pipe size
TEV LTD, ARMYTAGE ROAD, BRIGHOUSE, WEST YORKSHIRE, HD6 1QF.
Value
EMAIL:
sales@marstair.com
WEB:
19/19
Time Held For
(bar)
(bar)
(microns)
Value
(°C)
(°C)
TEL:
+ 44 (0) 1484 405600
FAX:
www.marstair.com
(min)
(min)
(min)
(barg)
(°C)
(K)
(°C)
(barg)
(°C)
(K)
(°C)
(A)
(Y/N)
(Kg)
(g)
(m)
(ʺ)
(ʺ)
+44 (0) 1484 405620
55908061-01